Mining Farm Construction

Customized your mining farm design and construction based on rich of
practical cases

Business Country

Provide one-stop overall plan of mining farm construction and consultation

U.S.A
Houston, Texas, Boston, Los Angeles, Chicago, etc
Canada
Vancouver, Toronto, Ottawa, etc
Russia
Moscow, Irkutsk, etc
Kazakhstan
Almaty
The United Arab Emirates
Dubai
Angola
Luanda
Malaysia
Kuala Lumpur, Butterworth, Penang
Thailand
Bangkok, Pattaya, Chiang Mai, etc
Paraguay
Ciudad del Este

Case Presentation

Some of the cases we have served may be useful for you

Air Cooling Mining Container
Environmental
1 The container is required to be placed on flat ground, horizontal degree (±1 degree).
2 The ground surfaced is required to be hardened and stable, able to withstand at least 14-ton load.
3 A 10-ton crane is needed for unloading the FBOX Container and cooling Container.
4 Altitude: ≤3000m. If the altitude is higher than 1000-meter, transformer and switch should be derated, the total power of FBOX Container must be decreased by 1% for each elevation increment of 100 meters.
5 Operating temperature: -25°C to 40°C. Operating humidity: 10%RH to 90%RH. When the initial coolant temperature is below 20 °C, the internal circulation should be turned on to heat up the coolant to above 20 °C before starting the mining machine.
6 When the ambient temperature is below 5 ℃, the cooling tower can be switched to cold-dry mode.
Read More
Oil Cooling Mining Machine Facility
Country: Malaysia
Mining machine model: Whatsminer M21s, Antminer S19
Total quantity: 900 units
Climate: 4 months of rainy days
Humidity: 80%
Maximum temperature: around 38°C
Normal temperature: around 20°C (rainy day) around 30°C (non-rainy day)
Water supply: Adequate
Site: Large, flat, low elevation
Power supply: Sufficient Load
Cooling system: Oil-cooling
Read More

Product FAQs

Find the help you need by searching our frequently asked question

What factors should be paid attention to in mine construction?
Ambient temperature and humidity, electricity charge, energy, area, load power consumption, etc
What services does mine construction mainly refer to?
It can provide a construction scheme for the new site and a water cooling and oil cooling retrofit and upgrading scheme for the original site.
How to choose your own mine construction plan?
The mine construction plan mainly includes air cooling, oil cooling and water cooling. It can be customized according to the site environment, machine conditions, demands, etc. The specific construction needs can be submitted to us.
How to get in touch with us?
1) You can submit your construction requirements at the top of this page, and our technicians will take the initiative to contact you.
2) You can directly click to contact us or online customer service, leave us a message, and we will reply to you as soon as possible.

Scheme

Numerous mine construction documents for your choice

Solar Mining Farm Construction Taking a mining farm in Spain as an example, we sorted out a relatively complete solar mining farm construction.

Register For Our Latest Event

We offer an informative newsletter to your E-mail,please check it out.